Total distance of 8,800m,including 2,800m of bridges,670m of tunnels and Taegu Interchange, construction of the section 1 of the highway that stretches from Taegu to Choonchun,shows the
experience and capacity in civil engineering.
Total distance of 8,800m,including 2,800m of bridges,670m of tunnels and Taegu Interchange, construction of the section
1 of the highway that stretches from Taegu toChoonchun, shows theexperience and capacity in civil engineering.
Completed in 2005, total length of 18506m including 4104m of bridge,1200m of tunnels,the highway is expected to act as the catalyst to stimulate the inland economy.
From Yangpyong station to Omokgyo station, section 5-13,and Yangpyong station were constructed using the NATM method.
Total length of 10460m including 130m of bridge, expansion of the highway is expected to reduce the bottleneck traffic jam at the section.Utilizing the existing road was a key to the construction,saving costs and resources.